Year 6, Day 75. “Living the Dream”. Tuesday, 7/14/2026, Clifty Hill 3. Day 29 Foundation Block Laying. Sweat bees are swarming today. It is thrilling that the corners are all coming out perfectly level. The french drains need to be done around two more walls. This foundation is getting done. We should be pouring the concrete floor in about a week in the crawl space under the master bedroom area. Although, Steve is saying he has a very optimistic wife lol.







Grass mowing is never ending.