Day 357 – “Living the Dream”. Friday, 4/22/2022.


The electrical work continues. The cooktop is wired and placed in a temporary counter. It has to be installed to get the final electrical inspection. It was another frustrating day. Cooktop would not work after it was hooked up.



The brand new breaker we used was bad and we had to replace it. Closet lights are in and lower level is ready for inspection. The upper level is also ready.



Today’s product recommendations are for finishing a bathroom. The LED antifog back lit mirror is so nice. Also, new bathrooms need new towels. And look at this great light for over your mirror if you don’t do the LED mirror. I can spend all day just looking at Amazon. https://amzn.to/3CzOwwq https://amzn.to/3xqqxN9 https://amzn.to/3KbqdcS