Year 6, Day 78. “Living the Dream”. Friday, 7/17/2026, Clifty Hill 3. Day 32 Foundation Block Laying.



It is 100 degrees Fahrenheit at 8:30am on our deck. I can hear the music blasting at the worksite. They must be happy like the corn and wild flowers are with the heat.







The first lumber was ordered today for the floor decking. We decided to work with Lumber King on this house. We like their lumber better, they are easy to work with(everything done through text messages), and their pricing is reasonable. An interesting fact is that we have used 160 bags of Type S Mason Mix so far for this foundation.

Todays video:
Daily Reflection:


Here’s a link to today’s Amazon recommendation: https://link.amazon/B0b8vvKlp Albott 36″ Power Trowel, 5.5 HP GX160 Gas Engine Concrete Finisher This power trowel is perfect for any concrete work. It’s powerful and efficient, a must-have for any job site. This is our first one and we should have bought one sooner. It is amazing.
As an Amazon Associate, I earn from qualifying purchases. #CommissionsEarned
Follow The Journey
Get new daily posts delivered directly to your inbox.

