Living the Dream Year 5 Day 205 – The Wellington – Clifty Hill 3 driveway work day 2

Year 5, Day 205 “Living the Dream”. Friday, 11/21/2025 – The Wellington. The driveway is going good. The culvert pipe is installed. It started to rain so it came to a sudden halt. What a muddy mess? Dense Pack will be ordered the first week of December. The drive way will be over 400 feet long. It will take about five loads or 125 tons of stone.