Living the Dream Year 4 Day 353 – The Wellington – Lower level bathroom ready for inspection, Butcher block counter top sanded, outside afternoon work

Year 4, Day 353, “Living the Dream”. Friday, 4/18/2025. The Wellington – Lower level bathroom is working and ready for inspection.

The butcher block counter in the bar room has been lightly sanded with 400 grit sand paper. It has been stained three times.

The afternoon was spent cleaning up the mound of dirt and weeds at the end of the driveway. It was way to nice to work outside all day.

Things to ponder today! Have to leave you thinking.

Here’s a link to today’s Amazon recommendation: https://amzn.to/4jFiBxO Quick Shine Multi Surface Floor Cleaner: We love this cleaner for the plank flooring in the lower level. We keep the bona mop container filled with it to squirt and spread. It does have a slight smell though. I do prefer a product with no smell.

As an Amazon Associate, I earn from qualifying purchases. #CommissionsEarned

Published by deestimes

Loving the beauty of traveling after retirement.

Leave a Reply

Discover more from Deestimes - Make every step of the journey count

Subscribe now to keep reading and get access to the full archive.

Continue reading