Year 4 Day 3 “Living the Dream”. Friday, 5/03/2024. Clifty Hill 2 – We are working on installing the copper water lines. There are a lot of fixtures in this house. Three toilets, four lavatories, one bathtub, two showers, two sinks, a washer, and two hose bibs. That is a lot of copper. The house is 52 feet long and these fixtures are spread all over the house.

Even though we have rented a vrbo home, we are spending all of our waking hours at the Wellington. We are currently using a generator and my mobile hotspot. We are in the process of setting up a temporary off grid battery system. This system will capture the excess energy from the generator when it is running. Then an inverter will run the lights and possibly a small refrigerator in the evenings. We think it will be a few months before we are hooked up to the electrical grid.


Tonight, we are heading to see Koral in her last high school play Annie. She is a senior and graduating this year. She will be attending Berea college in the fall. That is Justin’s alma mater. Koral is his youngest child. We are so very proud of her.


Of course, I have to also give a shout out and lots of praise to Julianna, Jenna’s oldest. We are super proud of her also as she was installed into Saint Mary’s Honors Society this morning. What smart girls they both are.

Things to ponder today! Have to leave you thinking.

YETI Tundra 75 cooler: Here’s a link to today product recommendation: https://amzn.to/3WJkqQ3 All the YETI coolers are great. They really keep the ice lasting a long time.

As an Amazon Associate, I earn from qualifying purchases. #CommissionsEarned
To view the complete daily diary, click here – This starts at Year 1 Day 1: Living the Dream – Deestimes – Make every step of the journey count
