Year 3 Day 309 – “Living the Dream”. Wednesday, 3/06/2024. Clifty Hill 2 – Worked on installing the lower-level/third bathroom waste lines. This is the hardest of the bathrooms because the waste lines run under the cement slab. Steve had to do a lot of digging and crawling around on the ground to install it. The footing was in the way, so he had to take a little piece off using a jack hammer.