Day 313 – “Living the Dream”. Wednesday, 3/09/2022. Today was a huge milestone for us. We got the turn on paper for 60 days of electricity.

I immediately took it to the electric company. They said within two weeks we will have the wires on the house and hooked up. We need to have the final electrical inspection done within that 60-day period That means all outlets and switches have to be on and the kitchen appliances in. So, we are working on the first-floor main level now. Want to get the kitchen in. In the evening we headed to Lowes for more corner bead.



Today’s product recommendation is for the Rev-A-Shelf. I love this for my pots, pans and lids. The one we recently installed is the 21 inches with a spot on the top shelf for the lids. We will also be installing a smaller one for baking dishes. These are awesome. https://amzn.to/3CzOwwq https://amzn.to/3ZcBuyq