Year 6, Day 28 “Living the Dream”. Thursday, 5/28/2026, Clifty Hill 3. Day 4 Foundation block laying. Beautiful sunny day today. The last few days we had over 7 inches of rain. I can literally see the flowers and grass growing. They are so happy that mother nature provided that long refreshing drink and now the warm sun. Oh boy are they happy. We are also. We can now get work completed on the home.

Six of the eleven corners are built.



The electric company site engineer stopped by today. We asked for a light to be put on the new electrcal pole at the end of our driveway. In order to do that a transformer has to be added. For the new home they will be installing another pole because the home is 85 feet from the existing pole. The maximum feet the electrical wires can run to a house is 75 feet.

Foundation Block Laying Day four video:
Daily reflection:



Here’s a link to today’s Amazon recommendation: https://amzn.to/4dnQgf0 Cetaphil Skin Activator Hydrating & Firming Body Lotion Fighting that old age skin. Use this everyday.
As an Amazon Associate, I earn from qualifying purchases. #CommissionsEarned
Follow The Journey
Get new daily posts delivered directly to your inbox.
