Living the Dream Year 4 Day 278 – The Wellington – Kitchen backsplash tiling

Year 4, Day 278, “Living the Dream”. Sunday, 2/02/2025. The Wellington – Punxsutawney Phil predicts six more weeks of winter. This prediction is after not seeing his shadow at Gobbler’s Knob in Punxsutawney, Pennsylvania. We are back home and back to work. Adding backsplash tiling in the kitchen. First, insulation was stuffed around the window. Then, wood was used to build a sill. Extension jambs were installed, and colonial casing was added. Extension jambs are frames. They fill the depth of the wall space. This spans from the inside face of the window frame or “jamb” to the face of the drywall. These finishing touches make the room and precision is very important.

Of course the day also involved a lot of unpacking, laundry, stocking up of groceries and watering plants.

Things to ponder today! Have to leave you thinking.

Soft Foam Professional Tradesman Pro Pads with Handle: https://amzn.to/4hvXRXY Don’t be without a few of these around the house, garage, and shed. We use them for everything from hardwood flooring, electrical work, plumbing, gardening, car maintenance, under the sink work, etc. Saves wear and tear on your knees and back.

As an Amazon Associate, I earn from qualifying purchases. #CommissionsEarned

Published by deestimes

Loving the beauty of traveling after retirement.

Leave a Reply

Discover more from Deestimes - Make every step of the journey count

Subscribe now to keep reading and get access to the full archive.

Continue reading